Project challenges
FUTURE-PROOF INVESTMENT:
The initial plan was for an array which would generate 1/8th of the annual electricity demand of the building; i.e. 230 MWh versus 2 GWh annual usage. However, this plan had to be drastically scaled back as a result of the Distribution Network Operator’s (DNO) objections in 2014 [see below].
Solution: Darke & Taylor (D&T) reworked all the calculations using a proprietary model to determine whether the project was feasible at the reduced 50kWp capacity. The initial 50kWp array was sited on the most ‘optimal’ part of the roof, south-facing and unobstructed, to maximise the power output.
DESIGN AN ELEGANT YET EFFICIENT SOLAR ARRAY:
The client requested that none of the panels should be visible from the ground level in order to preserve the aesthetic look of the building.
Solution: D&T managed to reduce the pitch of the solar array and used an imaginative counter-balance system to safeguard the visual impact from ground level.
DNO OBJECTIONS PLACED THE PROJECT IN DOUBT:
The DNO assumed a ‘worst case’ scenario; i.e. that all of the energy generated would be released back into the grid. Consequently, the DNO would only authorise a 50 kWp array.
Solution: D&T had already designed the infrastructure to cope with a significant increase in capacity should the DNO change its mind. In 2017, following a grid upgrade, the DNO permitted an additional 140kWp which D&T was able to add on without any need for re-planning.
Gallery
“The project went smoothly and enjoyed the full support of the team at the Business School.”
Oxford University Estate Services